Search of the experts

If you were interested with the exposed offers,
send us information about yourself (entry here)

Essence of inquiry

Date of issue


5.02 Manufacturers and suppliers of fibred carbon are required: carbon yarn 12Ê; T-700 a carbon yarn 12Ê; T-300 jersey 3Ê.

March, 14
2005


5.01 Developers, manufacturers and suppliers of the following materials for sound absorption, sound insulation, sound gating are required. Materials are made on the rubber basis. Area of application is sound insulation for auto interior.

March, 14
2005


4.24 The scientists who have experience in - arrangement (immobilisation) of structural proteins to biomaterial surfaces. These can be of either native origin or recombinant proteins such as collagens and fibronectin; peptidometry, proteomics, peptide modelling are required.

December, 17
2004


4.23 The scientists who use the following methods for biomaterial characterization: spectroscopy such as ESCA, (XPS, STS), microscopic technigues such as AFM, STM are required. Especially if these methods give possibilities to perform measurements on wet samples and to characterize precense of biological molecules on the material surface, types and distrubution of various chemical functional groups involved in adsorbtion of cell adhesion-mediating proteins , at least partly estimate thr spatial conformation of these molecules, characterize cell membrane of adhering cells etc.

December, 17
2004


4.22 Manufacturers and suppliers of the spherical activated coal are required. Balls should be diameter 0.56 mm +/-0.05 mm and have an active surface not less 1200-1500 m2/g

October, 11
2004


4.21 The consultations of the specialists in the field of flattening of walls (rolling) (from 10mm up to 5 mm) for steel seamless cylindrical barrels (L=1000, D=800mm) are required

October, 11
2004


4.20 The consultations of the specialists in the field of creation of superproof protective fabrics from thermal influence are required

September, 2
2004


4.19 The consultations of the specialists in the field of receiving diamond (diamondlike) coatings (plating) by different ways (electrophysical and electrochemical) are required

September, 2
2004


4.18 The consultations of the specialists in the field of the theory of decision of inventor tasks (TRIZ) are required

September, 2
2004


4.17 The consultations of the specialists in the field of high-frequency methods of synthesis (sintering) of ceramics are required

September, 2
2004


4.16 The consultations of the specialists in the field of CCFL technology (Cold Cathode Fluorescent Lamps) are required

September, 2
2004


4.15 The solution of the problem of protection of tank's internal surface is required. Conditions: transportation of sulfur at 1500C temperature .

June, 15
 2004


4.14 We are seeking proposals to make the body of pump of hydrostatic transmission (casting). There are curvilinear holes in the body. Pressure in the holes can be up to 32 MPa.

May, 18
 2004


4.13 The reference to republican competition "Best building product of the year" is placed at the homepage of our portal. Take part!

May, 18
 2004


4.12 The partners for executing of scientific-research project on theme: "Novel yeast expression system for heterologous protein expression" are required.

May, 18
 2004


4.11 We are seeking proposals to make a compact, energy-efficient gas-plasma generator that can be installed in the exhaust train of a vehicle and operated using onboard electricity.

April,13
 2004


4.10 The decision of a problem of usage of chemical additives in concrete for refusal of proparks of concrete is required.

April,13
 2004


4.9 The solution of the problem of durability increasing of coating is required. Conditions: the carbon steel units are working in the hydrogen sulphide environment under -50..+2500C temperature and 400-700 technical atmospheres pressure .

March,11
 2004


4.8 The solution of the problem of durability increasing of coating is required. Conditions: the spring steel units are working in sulfuric acid (2-10%) environment .

March,11
 2004


4.7 There is a technical project on creation of system for recycling of heat for heating and hot water supply of industrial workshop. Developers of recycling system are required

February,16
 2004


4.6 There is a technical project on clearing of atmosphere air from workplaces of the industrial enterprise . Developers of systems of clearing are required

February,16
 2004


4.5 The partners for executing of scientific-research project on theme: "Development of phospholipid enriched raw materials and food products from typical European oilseed press cakes" are required

February,16
 2004


4.4 The consultations of the specialists on processing of worn tires by the method of pyrolysis are required

February,2
 2004


4.3 The technology of the polymer antifriction layer spraying on items from silicone gums is required

February,2
 2004


4.2 The solution of the problem of positioning of wire-frame stripes from metal-cord or textile cord is required

There are usually used the light valves (photocells) for positioning of stripes. On-stream there is a pollution of conveyor belts. As a result the set sensor (the sensor of color) ceases during exploitation to find out the positioned stripes. In due course the wear products pollute the conveyor belt so, that a sensor, which identifies the measurement object through the belt, does not give the signals of sufficient level.

It is necessary to supply the equipment with a system of sensors, which would provide the reliable and precise positioning also at the pollution of the conveyor belt. At the same time the first sensor is used for change of speed of the belt and second sensor is used for positioning.

Specifications: Accuracy of positioning - + /- 5 mm; Tape speed of the transporter - 25 m/min - 2.5 m/min (reduction); Spacing interval between stripes from the cord - 300 mm; Altitude of stripes - from 0.7 up to 4 mm; Heaving oscillations of the conveyor belt + /- 1 mm.

February,2
 2004


4.1 The consultations of the specialists on the plasma spraying of powder ceramic materials are required

February,2
 2004